M4S Technical Knowledge Centre · TKC 01

Roofing Technical Details & Specifications

A structured reference space for architects, designers, engineers and project teams working with M4S stone-coated metal roofing systems.

Open reference geometry ↓Request CAD & specification set ↗
Reference module · dimensional coordination

Understand the overall tile and the effective cover.

The reference dimensions below show how overlap changes the installed cover module. Confirm the final profile data sheet before quantity take-off or fabrication release.

Reference dimensional schedule
Overall length
1340 mm
Effective cover length
1280 mm
Overall width
420 mm
Effective cover width
390 mm
Reference cover area
0.499 m²
Reference cover area
≈ 5.37 sq. ft.

Cover area calculation: 1.280 m × 0.390 m. Quantity must additionally account for roof geometry, hips, valleys, cut tiles, starter/termination conditions and approved wastage.

Architectural specification starter

A clean base clause for project documentation.

Suggested performance-based wording
Provide and install an approved M4S stone-coated metal roofing system comprising the selected profiled steel tile with corrosion-protective metallic coating, acrylic bonding system, natural stone-granule finish and protective surface coat; including compatible ridges, barges, valleys, flashings, fasteners, closures and all required accessories. Install to the approved roof geometry, support arrangement, fixing pattern, laps, alignment and weathering details, complete in accordance with the product-specific technical data, approved shop information and project requirements.
Insert the selected profile, colour, substrate/coating specification, applicable standard, warranty and project-specific performance criteria before issuing the final specification.
01

Product definition

Profile, colour, steel/coating specification, finish and accessory compatibility.

02

Performance basis

Location exposure, design wind actions, rainfall, slope, drainage and intended warranty.

03

Execution basis

Support system, fastener type and pattern, laps, junctions, tolerances and inspection points.

04

Close-out basis

Approved submittals, completion review, cleaning, care guidance and handover documents.

Junction planning library

Six details that decide whether the roof feels resolved.

These are coordination subjects—not generic one-size-fits-all construction details. M4S reviews the applicable condition against the selected profile and building geometry.

01

Ridge

Ridge-line closure, cap alignment, ventilation intent and weather-resistant termination.

02

Eave

Starter alignment, drip line, fascia relationship, gutter interface and first-course restraint.

03

Barge

Gable-edge closure, visual straightness, wind exposure and barge-cap termination.

04

Valley

Valley width, lining, discharge path, tile cuts, side clearance and maintenance access.

05

Wall abutment

Apron or sidewall flashing, counter-flashing interface and water-shedding sequence.

06

Penetration

Pipe or service upstand, compatible flashing, sealant restraint and inspection access.

Design responsibility matrix

Clear ownership prevents technical gaps.

WorkstreamArchitect / designerStructural engineerM4S Homes
Roof form & visual intentLeadReview implicationsProfile and detail input
Loads, member sizes & stabilityCoordinateLead and approveProvide product inputs
Profile, accessories & quantitiesApprove appearanceReview support interfaceDevelop and coordinate
Drainage and junction strategyLead geometryReview support/openingsRoofing detail input
Installation and handoverReview design intentInspect where appointedCoordinate roofing scope
Project submittal register

Request the evidence before approving the roof.

A professional roofing decision should leave a clear document trail from selection to handover.

Request the architect technical pack ↗
  1. 01Selected profile and colour schedule
  2. 02Product-specific technical data sheet
  3. 03Material layer and coating declaration
  4. 04Roof take-off and accessory schedule
  5. 05Approved junction / interface information
  6. 06Supporting-structure coordination information
  7. 07Applicable warranty terms and exclusions
  8. 08Completion and handover record
M4S Architect & Specification Desk

Send the drawing before the roof reaches site.

Share the roof plan, section, location, building type and design intent. We will identify the product and coordination information needed for the next review.